Roll Handling Solution
The customer has 300
pound rolls which need to be
loaded horizontally on a fixed spindle. We designed a
portable electric roll handler with a expanding mandrel to
lift rolls vertically off pallet, turn horizontal and slide
on the spindle. System has fail safe interlocks and is
charged in a standard 110v outlet.


 |
| |
| Plywood and Sheet Handling Vacuum
Lifter & Crane Installation
A woodworking customer gives us a
good example of our expertise installing ceiling mounted
light rail systems which require special fabrication for
long drops. Long threaded rod drops are dangerous due to rod
failure and do not offer stability from sway movement.
The customer purchased a reconditioned Unimove
vacuum lift tube with a full warranty from JRG.
We both install and service and often recycle equipment in
good condition to save our customers money and give new life
to surplused equipment.




 |
| |
| Carton and Drum Handling Crane
Installations - One with 300 foot runways!
This has been a very good
and reliable installation with
quite some age on it. The customer
handles 300
pound fiber drums and 60
pound boxes 24
hours a day 7 days a week with
Unimove vacuum lift tubes
mounted on KBK crane systems.
We installed these systems in 1995
and they have run continuously
for over 10 years. We installed 10 systems here,
one is 300 feet in length
with 5 each 300
pound capacity bridges.




 |
| |
| Carton Handling for an Electronics
Manufacturer This customer
needed a good ergonomic solution for palletizing cartons and
handling cartons off the end of packaging lines. We
installed multiple bridge cranes. Note the extended
handle on the vacuum lifters. Also note that the
vacuum pumps are mounted high in the ceiling to reduce noise
at floor level and conserve floor space. The photo was
taken before the new steel was painted. We did paint
it.




 |
| |
| Freestanding Workstation Cranes
for a Metalworking Manufacturer
This installation was a rather
complicated crane installation with multiple cranes and
multiple bridges to provide efficient overhead handling for
a new work cell. We installed the system on schedule.
They were happy, that's what counts.




 |
| |
| Heavy Carton Handling for Sanitary
Ware Manufacturer


 |
| |
| |
| |
| |
|
Top |
|